CBX Turbo Bike |
|
|
|
|
|
|
Sep 2, 2003 | Started working on air shifter hoses |
Aug 30, 2003 | Started installing Autometer gauges |
Aug 30, 2003 | Re-routed oil return from Turbo, now goes into clutch cover (as per suggestion from Mr Turbo) |
Aug 30, 2003 | Installed MRE Lockup clutch |
Aug 30, 2003 | Frame back from painter |
Aug 25, 2003 | Received gauges from Autometer |
Aug 25, 2003 | Delivered frame to painter |
Aug 18, 2003 | Offset bearing plate modified to fit |
Aug 12, 2003 | Received 15 tooth offset sprocket from D&G Chassis |
Jul 19, 2003 | Back to Athanas for wheelie bar and misc finishing touches on frame |
Mar 1, 2003 | Installed engine, working on fitting things together |
Feb 14, 2003 | Picked up custom frame from Athanas Racing Chassis |
Oct 1, 2002 | Engine runs |
Sep 8, 2002 | Purchased bike from Michael O'driscoll |
|
|
Finish lock up clutch | |
Get clutch handle, front brake, throttle | |
Install Air shifter controls | |
Re-weld waste gate | |
Puchase and install fuel pump | |
Transfer boost controller from sport bike | |
Transfer water injection from sport bike | |
Install battery | |
Make wiring harness | |
Paint bodywork | |
|
|
Replace right brake handle assembly with spare, return to Mike | |
Finish air shifter | |
Modify seat for larger person (me) | |
Check or replace all wiring | |
Replace throttle cables | |
Install air can for air shifter | |
Install new engine |